CSIRO Heliostat
Performance Engineering Group was engaged by the CSIRO to manufacture 500 high performance Heliostat Mirrors which provide energy to the Brayton collector. This demonstration energy field is located at the CSIRO Mayfield, NSW.
Performance Engineering Group also manufactured the Collector Tower.